PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Closing up the wall forms at Monumental Stairs Facing South (800x600).jpg Closing up the wall forms at Monumental Stairs Facing South-West(800x600).jpg Striping Shear wall panels at Elev. 1,2,3 Facing West.jpg Tying rebar mats at Elev. 4-Stair -2 2nd Floor Facing South (800x600).jpg Caulking Curtain Wall Mockup Facing MAST Trailer (800x600).jpg Stripping Shear Wall Panels at Elev. 1,2,3 Facing South-East (800x600).jpg Concrete prep. Facing North-East(800x600).jpg Footing area at Elev. 7, Stair -4,-5 Facing North (800x600).jpg Poured wall forms at Column Line L-M Facing North-East (800x600).jpg
Previous pageNext page Caulking Curtain Wall Mockup Facing MAST Trailer (800x600)
Caulking Curtain Wall Mockup Facing MAST Trailer (800x600)